Page 59 - California Stormwater Workshop Handouts
P. 59
Industrial General Permit Order
a. Dischargers with Level 2 status shall certify and submit via SMARTS a
Level 2 ERA Action Plan prepared by a QISP that addresses each new
Level 2 NAL exceedance by January 1 following the reporting year
during which the NAL exceedance(s) occurred. For each new Level 2
NAL exceedance, the Level 2 Action Plan will identify which of the
demonstrations in subsection D.2.a through c the Discharger has
selected to perform. A new Level 2 NAL exceedance is any Level 2 NAL
exceedance for 1) a new parameter in any drainage area, or 2) the same
parameter that is being addressed in an existing Level 2 ERA Action
Plan in a different drainage area.
b. The Discharger shall certify and submit via SMARTS the QISP’s
identification number, name, and contact information (telephone number,
e-mail address) if this information has changed since previous
certifications.
c. The Level 2 ERA Action Plan shall at a minimum address the drainage
areas with corresponding Level 2 NAL exceedances.
d. All elements of the Level 2 ERA Action Plan shall be implemented as
soon as practicable and completed no later than 1 year after submitting
the Level 2 ERA Action Plan.
e. The Level 2 ERA Action Plan shall include a schedule and a detailed
description of the tasks required to complete the Discharger’s selected
demonstration(s) as described below in Section D.2.a through c.
2. Level 2 ERA Technical Report
On January 1 of the reporting year following the submittal of the Level 2
ERA Action Plan, a Discharger with Level 2 status shall certify and submit a
Level 2 ERA Technical Report prepared by a QISP that includes one or
more of the following demonstrations:
a. Industrial Activity BMPs Demonstration
This shall include the following requirements, as applicable:
i. Shall include a description of the industrial pollutant sources and
corresponding industrial pollutants that are or may be related to the
NAL exceedance(s);
ii. Shall include an evaluation of all pollutant sources associated with
industrial activity that are or may be related to the NAL
exceedance(s);
iii. Where all of the Discharger’s implemented BMPs, including
additional BMPs identified in the Level 2 ERA Action Plan, achieve
Order 2014-0057-DWQ 51