Page 64 - California Stormwater Workshop Handouts
P. 64

Industrial General Permit Order

XIII. INACTIVE MINING OPERATION CERTIFICATION

      A. Inactive mining operations are defined in Part 3 of Attachment A of this General
           Permit. The Discharger may, in lieu of complying with the General Permit
           requirements described in subsection B below, certify and submit via SMARTS
           that their inactive mining operation meets the following conditions:

           1. The Discharger has determined and justified in the SWPPP that it is
               impracticable to implement the monitoring requirements in this General
               Permit for the inactive mining operation;

           2. A SWPPP has been signed (wet signature and license number) by a
               California licensed professional engineer and is being implemented in
               accordance with the requirements of this General Permit; and,

           3. The facility is in compliance with this General Permit, except as provided in
               subsection B below.

      B. The Discharger who has certified and submitted that they meet the conditions
           in subsection A above, are not subject to the following General Permit
           requirements:

           1. Monitoring Implementation Plan in Section X.I;

           2. Monitoring Requirements in Section XI;

           3. Exceedance Response Actions (ERAs) in Section XII; and,

           4. Annual Report Requirements in Section XVI.

      C. Inactive Mining Operation Certification Submittal Schedule

           1. The Discharger shall certify and submit via SMARTS NOI coverage PRDs
               listed in Section II.B.1 and meet the conditions in subsection A above.

           2. The Discharger shall annually inspect the inactive mining site and certify via
               SMARTS no later than July 15th of each reporting year, that their inactive
               mining operation continues to meet the conditions in subsection A above.

           3. The Discharger shall have a California licensed professional engineer
               review and update the SWPPP if there are changes to their inactive mining
               operation or additional BMPs are needed to comply with this General
               Permit. Any significant updates to the SWPPP shall be signed (wet
               signature and license number) by a California license professional engineer.

           4. The Discharger shall certify and submit via SMARTS any significantly
               revised SWPPP within 30 days of the revision(s).

Order 2014-0057-DWQ  56