Industrial General Permit Order

               Sampling Guidance Document.19 An annual NAL exceedance occurs when
               the average of all the analytical results for a parameter from samples taken
               within a reporting year exceeds the annual NAL value for that parameter
               listed in Table 2; and,

           2. Instantaneous maximum NAL exceedance: The Discharger shall compare
               all sampling and analytical results from each distinct sample (individual or
               combined as authorized by XI.C.5) to the corresponding instantaneous
               maximum NAL values in Table 2. An instantaneous maximum NAL
               exceedance occurs when two (2) or more analytical results from samples
               taken for any single parameter within a reporting year exceed the
               instantaneous maximum NAL value (for TSS and O&G) or are outside of the
               instantaneous maximum NAL range for pH.

      B. Baseline Status

           At the beginning of a Discharger’s NOI Coverage, all Dischargers have
           Baseline status for all parameters.

      C. Level 1 Status

           A Discharger’s Baseline status for any given parameter shall change to Level 1
           status if sampling results indicate an NAL exceedance for that same parameter.
           Level 1 status will commence on July 1 following the reporting year during
           which the exceedance(s) occurred.20

           1. Level 1 ERA Evaluation

               a. By October 1 following commencement of Level 1 status for any
                    parameter with sampling results indicating an NAL exceedance, the
                    Discharger shall:

               b. Complete an evaluation, with the assistance of a QISP, of the industrial
                    pollutant sources at the facility that are or may be related to the NAL
                    exceedance(s); and,

               c. Identify in the evaluation the corresponding BMPs in the SWPPP and
                    any additional BMPs and SWPPP revisions necessary to prevent future
                    NAL exceedances and to comply with the requirements of this General
                    Permit. Although the evaluation may focus on the drainage areas where
                    the NAL exceedance(s) occurred, all drainage areas shall be evaluated.

           2. Level 1 ERA Report

19 U.S. EPA. NPDES Storm Water Sampling Guidance Document. <http://www.epa.gov/npdes/pubs/owm0093.pdf >.
[as of February 4, 2014]
20 For all sampling results reported before June 30th of the preceding reporting year. If sample results

  indicating an NAL exceedance are submitted after June 30th, the Discharger will change status once
  those results have been reported.