Industrial General Permit Order

a. Dischargers with Level 2 status who submit an Industrial Activity BMPs
    Demonstration in accordance with subsection 2.a.i through iii above and
    have implemented BMPs to prevent future NAL exceedance(s) for the
    Level 2 parameter(s) shall return to baseline status for that parameter, if
    results from four (4) subsequent consecutive QSEs sampled indicate no
    additional NAL exceedance(s) for that parameter(s). If future NAL
    exceedances occur for the same parameter(s), the Discharger’s
    Baseline status will return to Level 2 status on July 1 in the subsequent
    reporting year during which the NAL exceedance(s) occurred. These
    Dischargers shall update the Level 2 ERA Technical Report as required
    above in Section D.3.c.

b. Dischargers are ineligible to return to baseline status if they submit any
    of the following:

i. A industrial activity BMP demonstration in accordance with
   subsection 2.a.iv above;

ii. An non-industrial pollutant source demonstration; or,

iii. A natural background pollutant source demonstration.

5. Level 2 ERA Implementation Extension

a. Dischargers that need additional time to submit the Level 2 ERA
    Technical Report shall be automatically granted a single time extension
    for up to six (6) months upon submitting the following items into
    SMARTS, as applicable:

     i. Reasons for the time extension;

ii. A revised Level 2 ERA Action Plan including a schedule and a
     detailed description of the necessary tasks still to be performed to
     complete the Level 2 ERA Technical Report; and

iii. A description of any additional temporary BMPs that will be
     implemented while permanent BMPs are being constructed.

b. The Regional Water Boards will review Level 2 ERA Implementation
    Extensions for completeness and adequacy. Requests for extensions
    that total more than six (6) months are not granted unless approved in
    writing by the Water Boards. The Water Boards may (1) reject or revise
    the time allowed to complete Level 2 ERA Implementation Extensions,
    (2) identify additional tasks necessary to complete the Level 2 ERA
    Technical Report, and/or (3) require the Discharger to implement
    additional temporary BMPs.

Order 2014-0057-DWQ  55