Page 53 - California Stormwater Workshop Handouts
P. 53

Industrial General Permit Order

activities, BMPs, and physical characteristics (grade, surface materials,
etc.) of the drainage area for each location to be sampled are
substantially similar to one another. To qualify for the Representative
Sampling Reduction, the Discharger shall provide a Representative
Sampling Reduction justification in the Monitoring Implementation Plan
section of the SWPPP.

b. The Representative Sampling Reduction justification shall include:

i. Identification and description of each drainage area and
   corresponding discharge location(s);

ii. A description of the industrial activities that occur throughout the
    drainage area;

iii. A description of the BMPs implemented in the drainage area;

iv. A description of the physical characteristics of the drainage area;

v. A rationale that demonstrates that the industrial activities and
    physical characteristics of the drainage area(s) are substantially
    similar; and,

vi. An identification of the discharge location(s) selected for
     representative sampling, and rationale demonstrating that the
     selected location(s) to be sampled are representative of the
     discharge from the entire drainage area.

c. A Discharger that satisfies the conditions of subsection 4.b.i through v
    above shall submit and certify via SMARTS the revisions to the
    Monitoring Implementation Plan that includes the Representative
    Sampling Reduction justification.

d. Upon submittal of the Representative Sampling Reduction justification,
    the Discharger may reduce the number of locations to be sampled in
    accordance with the Representative Sampling Reduction justification.
    The Regional Water Board may reject the Representative Sampling
    Reduction justification and/or request additional supporting
    documentation. In such instances, the Discharger is ineligible for the
    Representative Sampling Reduction until the Regional Water Board
    approves the Representative Sampling Reduction justification.

5. Qualified Combined Samples

a. The Discharger may authorize an analytical laboratory to combine
    samples of equal volume from as many as four (4) discharge locations if
    the industrial activities, BMPs, and physical characteristics (grade,
    surface materials, etc.) within each of the drainage areas are
    substantially similar to one another.

Order 2014-0057-DWQ            45
   48   49   50   51   52   53   54   55   56   57   58