Industrial General Permit Order

    Upon resumption of industrial activities at the facility, the Discharger shall,
    via SMARTS, confirm and/or update the date the facility’s industrial activities
    have resumed. At this time, the Discharger is required to resume all
    compliance activities under this General Permit.
    The Regional Water Boards may review the submitted information
    pertaining to the temporary suspension of industrial activities. Upon review,
    the Regional Water Board may request revisions or reject the Discharger’s
    request to temporarily suspend monitoring.

4. BMP Descriptions

      a. The Discharger shall ensure that the SWPPP identifies each BMP
           being implemented at the facility, including:
         i. The pollutant(s) that the BMP is designed to reduce or prevent in
             industrial storm water discharges;

         ii. The frequency, time(s) of day, or conditions when the BMP is
             scheduled for implementation;

        iii. The locations within each area of industrial activity or industrial
             pollutant source where the BMP shall be implemented;

        iv. The individual and/or position responsible for implementing the BMP;

        v. The procedures, including maintenance procedures, and/or
             instructions to implement the BMP effectively;

        vi. The equipment and tools necessary to implement the BMP
             effectively; and,

       vii. The BMPs that may require more frequent visual observations
             beyond the monthly visual observations as described in Section
             XI.A.1.

    b. The Discharger shall ensure that the SWPPP identifies and justifies each
         minimum BMP or applicable advanced BMP not being implemented at
         the facility because they do not reflect best industry practice considering
         technological availability and economic practicability and achievability.

    c. The Discharger shall identify any BMPs described in subsection a above
         that are implemented in lieu of any of the minimum or applicable
         advanced BMPs.

5. BMP Summary Table

    The Discharger shall prepare a table summarizing each identified area of
    industrial activity, the associated industrial pollutant sources, the industrial
    pollutants, and the BMPs being implemented.