Page 40 - California Stormwater Workshop Handouts
P. 40

Industrial General Permit Order

The Discharger shall:

i. Prevent or minimize handling of industrial materials or wastes that
   can be readily mobilized by contact with storm water during a storm
   event;

ii. Contain all stored non-solid industrial materials or wastes (e.g.,
    particulates, powders, shredded paper, etc.) that can be transported
    or dispersed by the wind or contact with storm water;

iii. Cover industrial waste disposal containers and industrial material
     storage containers that contain industrial materials when not in use;

iv. Divert run-on and storm water generated from within the facility away
     from all stockpiled materials;

v. Clean all spills of industrial materials or wastes that occur during
    handling in accordance with the spill response procedures (Section
    X.H.1.c); and,

vi. Observe and clean as appropriate, any outdoor material or waste
     handling equipment or containers that can be contaminated by
     contact with industrial materials or wastes.

e. Erosion and Sediment Controls

    For each erodible surface facility location identified in the SWPPP
    (Section X.G.1.f), the Discharger shall:

i. Implement effective wind erosion controls;

ii. Provide effective stabilization for inactive areas, finished slopes, and
    other erodible areas prior to a forecasted storm event;

iii. Maintain effective perimeter controls and stabilize all site entrances
     and exits to sufficiently control discharges of erodible materials from
     discharging or being tracked off the site;

iv. Divert run-on and storm water generated from within the facility away
     from all erodible materials; and,

v. If sediment basins are implemented, ensure compliance with the
    design storm standards in Section X.H.6.

f. Employee Training Program
    The Discharger shall:

i. Ensure that all team members implementing the various compliance
   activities of this General Permit are properly trained to implement the
   requirements of this General Permit, including but not limited to: BMP
   implementation, BMP effectiveness evaluations, visual observations,

Order 2014-0057-DWQ    32
   35   36   37   38   39   40   41   42   43   44   45