Page 183 - California Stormwater Workshop Handouts
P. 183

ATTACHMENT G

       REQUIREMENTS FOR DISCHARGERS WHO HAVE BEEN GRANTED AN
                  OCEAN PLAN EXCEPTION FOR DISCHARGES TO ASBS

         a. Discharges associated with emergency fire fighting operations.

         b. Foundation and footing drains.

         c. Water from crawl space or basement pumps.

         d. Hillside dewatering.

         e. Naturally occurring groundwater seepage via a storm drain.

         f. Non-anthropogenic flows from a naturally occurring stream via a culvert or
             storm drain, as long as there are no contributions of anthropogenic runoff.

    3. Authorized ASBS Non- Storm Water Discharges shall not cause or contribute to
         a violation of the water quality objectives in Chapter II of the Ocean Plan nor alter
         natural ocean water quality in an ASBS.

    4. At the San Clemente Island ASBS, discharges incidental to military training and
         research, development, test, and evaluation operations are allowed. Discharges
         incidental to underwater demolition and other in-water explosions are not allowed
         in the two military closure areas in the vicinity of Wilson Cove and Castle Rock.
         Discharges must not result in a violation of the water quality objectives, including
         the protection of the marine aquatic life beneficial use, anywhere in the ASBS.

    5. At the San Nicolas Island and Begg Rock ASBS, discharges incidental to military
         research, development, testing, and evaluation of, and training with, guided
         missile and other weapons systems, fleet training exercises, small-scale
         amphibious warfare training, and special warfare training are allowed.
         Discharges incidental to underwater demolition and other in-water explosions are
         not allowed. Discharges must not result in a violation of the water quality
         objectives, including the protection of the marine aquatic life beneficial use,
         anywhere in the ASBS.

C. ASBS Compliance Plan

    1. State Water Board Resolution 2012-0012 grants an exception to the Ocean
         Plan’s prohibition on discharges to ASBS (ASBS Exception) to applicants who
         were identified as Dischargers of industrial storm water to ASBS (ASBS
         Dischargers). Each ASBS Discharger shall specifically address the prohibition of
         ASBS Non-Storm Water Discharges and the requirement to maintain natural
         water quality for industrial storm water discharges to an ASBS in an ASBS
         Compliance Plan to be included in the ASBS Discharger’s SWPPP. The ASBS
         Compliance Plan is subject to approval by the Executive Director of the State
         Water Board. The ASBS Compliance Plan shall include:

Order 2014-0057-DWQ  2
   178   179   180   181   182   183   184   185   186   187   188