Page 114 - California Stormwater Workshop Handouts
P. 114

Industrial General Permit Fact Sheet

Dischargers are also required to submit their SWPPPs and any SWPPP
revisions via SMARTS; accordingly, BMP revisions made in response to
observed compliance problems will be included in the revised SWPPP
electronically submitted via SMARTS. Not all SWPPP revisions are
significant and it is up to the Dischargers to distinguish between revisions
that are significant and those that are not significant. If no changes are
made at all to the SWPPP, the Discharger is not required to resubmit the
SWPPP on any specific frequency.

  Significant SWPPP Revisions: Dischargers are required to certify and
      submit via SMARTS their SWPPP within 30 days of the significant
      revision(s). While it is not easy to draw a line generally between
      revisions that are significant and those that are not significant,
      Dischargers are not required to certify and submit via SMARTS any
      SWPPP revisions that are comprised of only typographical fixes or
      minor clarifications.

  All Other SWPPP Revisions: Dischargers are required to submit
      revisions to the SWPPP that are determined to not be significant every
      three (3) months in the reporting year.

Order 2014-0057-DWQ  30
   109   110   111   112   113   114   115   116   117   118   119